Monday, June 29, 2009

One down and two to go !




The house up north is really not done ,but it is close enough there is a tiny spot of light at the end of the tunnel.
I can see it ,and the breeze is blowing right at us.
The two at the beach are actually progressing well ,and we have had a few small problems ,but nothing to worry about. The roof is on the bay house and the siding is done.
The rough plumbing and electric are in process ,and it s really taking shape.
The other house is coming along well ,but roof lines and a few changes have slowed the process.
24 days of rain out of the last 30 have slowed each house up a little ,but the guys building both homes are progressing fine.
Here are some recent pics.

Tuesday, June 16, 2009

The house up north is almost complete after some serious pain.




We moved in to the house up north and it was a fiasco, as the electrical work was done very poorly.They had to come in and completely re-do the electrical and it is not complete still.
Long story but we are getting there.
The house is beautiful and decorated by Carol St John the best decorator in the world.I am enclosing some pictures and we are almost through the pain.
The builder stepped up big and got almost everything done that was not complete and or wrong.
It is all getting done and we are almost completely comfortable in the house.
It is beautiful and the end result is a beautiful house done the way we like it.